ECA call for case studies of Net Zero Carbon work
The climate emergency is changing the way we live. By delivering the changes, electrotechnical firms are essential to achieving Net Zero Carbon.
The Electrical Contractors Association Members are seizing opportunities to create a cleaner world. ECA supports the skills and technologies crucial to reaching Net Zero Carbon in the UK by 2050 and is looking for examples of innovation and good practice in low carbon installation from across its Membership.
Note that case studies will only be accepted if accompanied by the name and contact details of the person submitting the case study. If it is intended to publish the case study approval will be sought on the final version, as case studies may be edited for brevity and consistency.
Invitations are open to submit case studies from ECA members to [email protected], using the simple template which can be downloaded here.
Please submit case studies in word format.
The case study should be:
- A demonstration of low-carbon electrotechnical and/or engineering services work, or
- A demonstration of corporate social responsibility (CSR) policy in practice, with measurable outcomes.
ECA works closely with its Members, industry partners and Government to help Britain transition to Net Zero Carbon. We produce regular guidance notes, technical bulletins, and industry updates to keep Members at the forefront of the Net Zero transition. Learn more here.
This article appears on the ECA news and blog site as "Call for case studies: Net Zero Carbon Work" dated May 31, 2023.
--ECA
[edit] Related articles on Designing Buildings
- Achieving net zero in social housing.
- Actuate UK issues climate warning and urges action.
- Aligning net zero with the levelling-up agenda.
- A zero-carbon UK by 2050?
- Carbon footprint.
- Carbon negative.
- Carbon neutral.
- Case study.
- Construction reports.
- Climate Change Act.
- Construction skills crisis threatens UK net zero goals.
- CO2nstruct Zero programme grows to over 70 businesses.
- Fabric first investigation into net zero for existing buildings.
- Half of public sector bodies not planning for net zero carbon.
- Heat pumps and heat waves: How overheating complicates ending gas in the UK.
- Infrastructure carbon reduction misses net-zero target.
- Low or zero carbon technologies.
- Making Mission Possible: report on achieving a zero-carbon economy by 2030.
- Nearly zero-energy building.
- Net Zero All Party Parliamentary Group NZ APPG.
- Net zero by 2050.
- Net zero (whole life) carbon.
- Net zero carbon building.
- Net zero carbon emissions.
- Net zero strategy: build back greener.
- Planning the infrastructure transition to net-zero.
- Research in the construction industry.
- Scotland publishes plans to reach net zero targets with Heat in Buildings Strategy.
- Skilled workforce unable to meet net zero ambitions.
- Smoothing the path to net zero.
- Thermal imaging of the building fabric in the net zero world.
- Transform to Net Zero.
- Use case.
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February
Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.